|
|
 |
| |
« back «
| AAF Properties at Rudgear |
|
|
Walnut Creek, California |
Principal-in-Charge of the geotechnical investigations of the 6-acre hillside property for potential development. |
| |
| Airport Plaza Inn |
|
|
Millbrae, California |
Principal-in-Charge for the geotechnical and seismic design investigations for the proposed 6-story pile supported structure. |
| |
| Andiffred Building |
|
|
San Francisco, California |
Project Manager for the geotechnical and earthquake engineering evaluations for seismic retrofit of the historic building pile supported in Bay mud. |
| |
| Arbora Corporation |
|
|
Alamo, California |
Project Manager for the geotechnical and seismic feasibility evaluation for low density residential development. |
| |
| Cal-West Building |
|
|
Long Beach, California |
Project Manager for the ambient vi-bration analysis, seismicity evaluation, and site-specific ground motion time-history and response spectra recommendation. |
| |
| Concord Hilton |
|
|
Concord, California |
Project Manager for the geotechnical and earthquake engineering investi-gations for the 14-story hotel building. Evaluated both mat foundation and pile foundations. |
| |
| Coyote Point Marina |
|
|
San Mateo, California |
Geotechnical investigations for the berthing facilities, breakwater wall, and land improvements including restaurant, parking lot and access road, and evaluation of dredging requirements and dredge disposal alternatives. |
| |
| Fashion Island Shopping Center |
|
|
San Mateo, California |
Principal-in-Charge of the geotechnical investigation and construction testing of and monitoring of the 70-acre shopping center over 50 feet of Bay mud with anticipated 50-year settlement of 4 to 6 feet. |
| |
| Grayson Development |
|
|
Pleasant Hill, California |
Project Manager for the geotechnical investigations and seismicity evaluation for the low density residential development. |
| |
| Holiday Inn |
|
|
San Francisco, California |
Geotechnical and seismological in-vestigations and recommendations for foundation design and ground motion response spectra. |
| |
| Hunters Point Development |
|
|
San Francisco, California |
Principal-in-Charge for the geotechnical and seismic design investigations for medium density residential project. |
| |
| Isabel Cook Homes |
|
|
San Anselmo, California |
Principal-in-Charge of the soil and foundation investigations and design recommendations. |
| |
| Kappas Marina |
|
|
Sausalito, California |
Principal-in-Charge of the geotechnical investigations of the rehabilitation of the marina and development of new breakwater walls, berthing facilities, marina center building, and the bridge. |
| |
| La Mesa Redevelopment Structure |
|
|
La Mesa, California |
Project Manager for the geotechnical investigations and seismicity evaluation for the 12-story high building including probabilistic seismicity and site specific design response spectra. |
| |
| Marriott Hotel |
|
|
Burlingame, California |
Project Manager for the evaluations of the geotechnical design criteria in light of excavation slope deformations, and analysis of the construction scheduling for timely completion of the project. |
| |
| Meadowbrook Residential Project |
|
|
Freemont, California |
Principal-in-Charge for the geotechnical and seismic design investigations for high density residential project. |
| |
| Mission Professional Plaza |
|
|
San Francisco, California |
Principal-in-Charge for the geotechnical and seismic evaluations for the upgrading and expansion. |
| |
| Newark Holiday Inn |
|
|
Newark, California |
Principal-in-Charge for the geotechnical and earthquake engineering investigations for the 6-story hotel building to be pile supported into Bay mud. |
| |
| Newark Shopping Center |
|
|
Newark, California |
Principal-in-Charge for the geotechnical investigations and construction testing and monitoring of the 120-acre shopping center. |
| |
| Oak Knoll Shopping Center |
|
|
Novato, California |
Principal-in-Charge for the geotechnical investigations and construction testing and monitoring of the 87-acre shopping center. |
| |
| Park View Terrace |
|
|
San Pablo, California |
Principal-in-Charge for the geotechnical and seismic design investigations of high density high rise residential project. |
| |
| Pasadena Pilgrim Tower |
|
|
Pasadena, California |
Project Manager for the geotechnical investigations and seismicity evaluation for the 12-story high density residential building with three basement levels. Also evaluated design response spectra in light of the severe foundation compliance due to extensive basement. |
| |
| PT & T Building |
|
|
Vermont, California |
Project Manager for the geotechnical investigations and seismicity evaluation for the 9-story structure. Also recommended ground motion time history and response spectra for design. |
| |
| Rowland Plaza |
|
|
Novato, California |
Principal-in-Charge of the geotechnical investigation included drilling, sampling, testing and report for this 20-acre Bay Mud site. Final design recommendations were provided and construction observations were per-formed. |
| |
| Sebastian Vineyard |
|
|
Schellville, California |
Project Manager for the soil and foundation investigation and evaluation of seismicity and liquefaction potential for the site of major plant expansion. The studies included side-by-side comparison of SPT data obtained through rotary wash-boring and hollow stem drilling methods. The results indicated that the site previously considered to be susceptible to liquefaction when studied by hollow-stem drilling is not susceptible when rotary wash boring method used. This saved the client over $1M in anticipated remedial work. |
| |
| Sheraton Hotel |
|
|
Freemont, California |
Principal-in-Charge of the geotechnical and earthquake engineering investigations for the proposed hotel structure. Studies also included prob-abilistic ground motion design criteria. Also presented recommendations regarding mitigation of the potential collapse (hydro-consolidation) of the foundation soils. |
| |
| Shoreline Center |
|
|
Sausalito, California |
Principal-in-Charge of the geotechnical investigations of the major restaurant complex on the waterfront, and foundation and seismic design recommendations. |
| |
| Supermex Tower |
|
|
Los Angeles, California |
Project Manager for the seismicity evaluations and site-specific response spectra recommendation for the 11-story building. The studies also included development of probability distribution function for different levels of ground acceleration. |
| |
| Village Shopping Center |
|
|
Corte Madera, California |
Project Manager for the geotechnical investigations and construction testing and monitoring of the 110-acre shop-ping center over the bay-mud. The thickness of the mud varied and past history of loading of the mud also dif-fered in various sections of the shopping center. The foundation schemes included piles in the northern part, wick-drains and preloading in the mid-section, and preloading in the southern section. Actual measured settlements matched the calculated settlements within 10 percent error. |
| |
« back «
|
|
|
|