Forest Lake Intake/Outlet Tower |
California-American Water Company |
Project Manager for the safety evaluation of the 48 ft high brick-mortar intake/outlet tower built in 1892. The dynamic analyses indicated that the tower could not meet the present safety requirements. Subsequently, designed a new inlet/outlet structure to be supported on the upstream face of the dam. Also designed multi-level valves and the outlet structure (pipe) since the original outlet tunnel was found to have a number of broken sections. |
|
Lake Herman Reservoir Intake/Outlet Tower |
City of Benicia Department of Public Works |
Project Manager for the safety evaluation of the 50 ft high intake/outlet tower built in 1905. The structure had survived the 1906 San Francisco earthquake. The analyses, using mode superposition method, indicated that the tower meets the safety requirements. |
|
Miliken Reservoir Tower |
City of Napa Department of Public Works |
Project Manager for the dynamic analysis of the 108 ft high outlet tower for an MCE of M6.5 with a peak ground acceleration of 0.6g. |
|
« back «
|
|
|
|